Fairforest Middle School
Construction has started at new school site, tucked off Lincoln School Road just before Oakbrook Preparatory School. At a cost of about $52 million.
The school — set to open in August 2019 — will be built to hold up to 1,100 students, about 200 more than the current Fairforest Middle population.
The school — set to open in August 2019 — will be built to hold up to 1,100 students, about 200 more than the current Fairforest Middle population.